Remediation of the damaged concrete surfaces was carried out for a refinery's fire-fighting basin in Schwedt. Due to cracked concrete slabs, the basin had to be repaired permanently and economically. Approximately 1,000 m² of Concrete Canvas were used, ensuring fast installation, high resistance, and long-term protection of the basin surfaces.
Customer PCK
Location Schwedt, Germany
Sector Petrochemicals
Object Fire-fighting basin
Project Basin remediation due to cracked concrete slabs
Product 1,000 m² Concrete Canvas